December 21, 2024

Bam Bam Receives Acceptance for Second Amended Notice and Expands Drilling at Majuba Hill Copper Project

12 November 2021
431

Bam Bam Resources Corp.

CSE: BBR, OTC: NPEZF, FSE: 4NPB

Bam Bam Resources Corp. reports that the US Department of the Interior’s Bureau of Land Management (BLM) has accepted the second amendment and the required bond is in place for the expanded drilling at the Majuba Hill Copper Project in Pershing County, Nevada.

Additional drill sites are planned to expand the Majuba-Known Copper Oxide and test the Induced Polarization (IP) Resistivity Anomaly that suggests more Deep Porphyry may underly the DeSoto Copper Oxide Target.

Drilling at Majuba Hill Copper Project

David Greenway, President and CEO, commented: “The additional permitting is very timely because we have the drill rig on-site. This is an ideal time to drill for a possible westward extension to our Known Copper-Oxide area.”

Quality Assurance/Quality Control (“QA/QC”) Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.

Qualified Person

The scientific and technical information contained in this news release has been reviewed by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent consulting geologist who is a “Qualified Person” as such term is defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43- 101”).

 About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

For further information on Bam Bam Resources contact, Joel Warawa, VP of Corporate Communications at [email protected] or 1 (855) 475-0745

Follow us on Social Media to receive emerging news updates:

Follow us Facebook: https://www.facebook.com/miningIR

Follow us Twitter: https://twitter.com/MiningirMedia

Follow us Instagram: https://www.instagram.com/miningir/

Follow us on LinkedIn: https://www.linkedin.com/company/miningir/

Disclaimer
MiningIR hosts a variety of articles from a range of sources. Our content, while interesting, should not be considered as formal financial advice. Always seek professional guidance and consult a range of sources before investing.
James Hyland, MiningIR
Share