December 30, 2024

Green Battery Minerals Exhibitioning at the PDAC 2024 – Demand for Ex-China Graphite Grows

28 February 2024
3041

Green Battery Minerals Inc.

TSX-V: GEM | FSE: BK2P | WKN: A2QENP | OTC: GBMIF

Green Battery Minerals Inc. would like to invite to visit at Booth #2103 at the 2024 PDAC Convention in Toronto.

Location:
Metro Toronto Convention Centre, Toronto, Canada
222 Bremner Blvd, Toronto, ON M5V 3L9

Hours:
Sunday, March 3, 2024     10:00 am – 5:00 pm
Monday, March 4, 2024    10:00 am – 5:00 pm
Tuesday, March 5, 2024    10:00 am – 5:00 pm
Wednesday, March 6, 2024     9:00 am – 12:00 pm

Register: https://www.pdac.ca/convention

North American graphite prices are driven by growing demand for ex-China graphite.Downstream players are looking to diversify their sourced material away from China.Canadian graphite mining companies are establishing offtake agreements with end users.The graphite deficit is expected to intensify from about 400,000 tonnes in 2030 to around 5 million tonnes in 2040. (www.benchmarkminerals.com)
Looking forward to seeing you at the PDAC 2024!

About the Berkwood Graphite Project
The Berkwood Graphite Project is located within the jurisdiction of Quebec, in the Manicouagan Regional County Municipality, three hours driving time from the city of Baie-Comeau. Easy access is provided via a major secondary road and numerous tertiary and forest roads that traverse the property.
The Zone 1 resource lies 8 km southwest of Nouveau Monde Graphite’s deposit which has a $3.5 Billion NPV.  The Company believes its Zone 1 resource and that of Nouveau Monde share many similar geological characteristics with the Zone 1 resource being one of the highest-grade graphite resources in the world.

The current mineral resource at the Berkwood Graphite Project includes in-pit constrained resources totalling 1,755,300 tonnes of indicated resources at 17.00 % Cgr and 1,526,400 tonnes in inferred resources at 16.39 % Cgr.
 In-pit Resource at Lac Gueret South Project (rounded numbers)GEM Resource

The mineral resource estimates above are described in the technical report entitled, NI 43-101 Technical Report Mineral Resource Estimate on the Lac Gueret South Graphite Property, Quebec, Canada. With an Effective date of June 19th, 2019, dated June 30th, 2019, by Edward Lyons, PGeo., Florent Baril, ing., and Claude Duplessis, ing.
Link to Report:
https://greenbatteryminerals.com/wp-content/uploads/ReportFINAL_compressed.pdf

About the Company: Green Battery Minerals is managed by a team with over 150 years of collective experience with a proven track record of not just finding numerous mines but building and operating them as well. The Green Battery Minerals management team’s most recent success is discovering the Berkwood graphite resource in Northern Québec. Green Battery Minerals owns 100% of this asset and the Company’s shareholders will benefit from this asset as the demand for graphite for electric vehicles increases significantly.

On Behalf of the Board of Directors

Green Battery Minerals lnc.
‘Thomas Yingling‘
President, CEO & Director

Follow us on Social Media to receive emerging news updates:

Follow us Facebook: https://www.facebook.com/miningIR

Follow us Twitter: https://twitter.com/MiningirMedia

Follow us Instagram: https://www.instagram.com/miningir/

Follow us on LinkedIn: https://www.linkedin.com/company/miningir/

Disclaimer
MiningIR hosts a variety of articles from a range of sources. Our content, while interesting, should not be considered as formal financial advice. Always seek professional guidance and consult a range of sources before investing.
James Hyland, MiningIR
Share