Bam Bam Resources Corp. just announced that a contract has been signed with Boart Longyear to drill at the Majuba Hill Porphyry Copper Project in Pershing County Nevada. Drill plans call for 2468 to 3353 meters (8000 to 11,000 feet) in 11-15 reverse-circulation holes. The drilling is focused on expanding copper mineralization identified in previous drilling.
Bam Bam field personnel and contractors will continue to use operational health and safety protocols consistent with ensuring the health and safety of our people and the local community.
Quality Assurance/Quality Control (“QA/QC”) Measures, Chain of Custody
The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported directly to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.
All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.
Qualified Person
The scientific and technical information contained in this news release has been reviewed by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent consulting geologist who is a “Qualified Person” as such term is defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43- 101”).
About Bam Bam Resources Corp.
Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.
The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.
For further information on Bam Bam Resources contact, Joel Warawa, VP of Corporate Communications at [email protected] or 1 (855) 475-0745