Heliostar Metals Ltd. mining investment news and information
Heliostar’s New Parallel Panel Yields 16m Grading 11.2 g/t Gold within 147m Grading 4.1 g/t Gold at Ana Paula Project
November 8, 2023
Highlights: - 147.05 metres @ 4.13 grams per tonne (g/t) gold including - 16.0 metres @ 11.2 g/t gold in…Heliostar Drills 63m Grading 10.4 g/t Gold and 14.6m Grading 33.0 g/t Gold at the Ana Paula Project, Mexico
September 25, 2023
Heliostar Metals Ltd. report additional drill results from the Ana Paula Project in Mexico (“Ana Paula” or the “Ana Paula…Heliostar Drills 31.8 g/t Gold over 9.5 Metres within 8.0 g/t Gold over 72.0 Metres in Up-Plunge Target at the Ana Paula Project.
August 9, 2023
Heliostar Metals Ltd. report additional drill results from the Ana Paula project in Mexico (“Ana Paula” or the “Ana Paula…